| File
Name |
Size |
Description |
|
ASSAP-WP06-01 |
21KB |
Proposed Agenda of Meeting #06 of RTCA
SC-186 WG-4B to be held at the facilities of Boeing in Renton WA
on 22 - 24 August 2006 |
|
ASSAP-WP06-02 |
16KB |
Summary of Meeting #05 of RTCA SC-186 WG-4B held as a
Teleconference, starting at 2:00pm EDT on 10 August 2006 |
|
ASSAP-WP06-03 |
67KB |
Summary of the Status Information
given to the RTCA SC-186 Plenary in June, as presented by
Roxaneh Chamlou of Mitre |
|
ASSAP-WP06-04 |
101KB |
Discussion on the Conflict Detection
Application Metrics, Algorithm and Requirements, as presented by
Ganghuai Wang of Mitre |
|
ASSAP-WP06-05 |
103KB |
Discussion on the Enhanced Visual
Acquisition Application Integrity and Safety Analysis, as
presented by Don Walker of Honeywell |
|
ASSAP-WP06-06 |
104KB |
Discussion of ASSAP MOPS Issue #10
regarding how ADS-B and TIS-B Reports are Assembled from 1090ES
Messages, as presented by Tom Eich of L-3 / ACSS |
|
ASSAP-WP06-07 |
105KB |
Discussion of ASSAP MOPS Issue #SP6:
Initial Thoughts on Dual Link Reception of ADS-B, as presented
by Roxaneh Chanmlou of Mitre |
|
ASSAP-WP06-08 |
185KB |
A Comparison of Changes Made to Both
DO-260 and DO-260A, as presented by Robert Duffer of the FAA |
|
ASSAP-WP06-09 |
109KB |
A Discussion of Associated Technical
Issues Related to the Differences between DO-260 and DO-260A, as
presented by Robert Duffer of the FAA |
|
ASSAP-WP06-10 |
643KB |
An Overview and Discussion of
Outputs of the ADS-B Systems, as presented by Peter Skaves and
Robert Duffer of the FAA |
|
ASSAP-WP06-11 |
141KB |
A Review and Discussion of all of
the ASSAP MOPS Issues |
|
ASSAP-WP06-12 |
67KB |
A Brief Status of the Issues of TIS-B
and ADS-R Service Volume Messages, as presented by Roxaneh
Chamlou |
|
ASSAP-WP06-13 |
43KB |
A Proposed Example of a TIS-B
Management Message as it was presented to the ICAO ASP Technical
Subgroup, provided by Ronnie Jones of the FAA |
|
ASSAP-WP06-14 |
109KB |
Copy of the Interim Guidance for UAT
Avionics Operating with Safe Flight 21 ADS-B, TIS-B and FIS-B
Ground Infrastructure, as provided by Chris Moody of Mitre |
|
ASSAP-WP06-15 |
344KB |
Paper entitled "TIS-B: Calculation
of Navigation Accuracy Category for Position and Velocity
Parameters, by Roxaneh Chamlou of Mitre |
|
ASSAP-WP06-16 |
48KB |
GPS Integrity Monitoring and
Associated ADS-B Operational Characteristics, as provided by
Stan Jones of Mitre |
|
ASSAP-WP06-17 |
158KB |
A Discussion of ASSAP MOPS Action
Item #31 and the Proposing of the Scaling and Tradeoff of NIC
and SIL to Meet Application Requirements, as presented by Joel
Wichgers of Rockwell Collins |
|
ASSAP-WP06-18 |
102KB |
A Discussion of the Status of ASSAP
MOPS Action Items #3 and #13, as presented by Tom Eich of L-3 /
ACSS |
|
ASSAP-WP06-19 |
104KB |
A Discussion of the Status of ASSAP
MOPS Action Item #4, as presented by Tom Eich of L-3 / ACSS |
|
ASSAP-WP06-20 |
107KB |
A Discussion of the Status of ASSAP
MOPS Action Item #5, as presented by Tom Eich of L-3 / ACSS |
|
ASSAP-WP06-21 |
97KB |
A Discussion of the Status of ASSAP
MOPS Issue #I5, as presented by Tom Eich of L-3 / ACSS |
|
ASSAP-WP06-22 |
284KB |
A Copy of the ADS-B Program Final
Program Requirements, dated May 9, 2006 |
|
ASSAP-WP06-23 |
31KB |
A Review and Discussion of the
Action Item Log |
|
ASSAP-Mtg06-Minutes |
41KB |
Summary of Meeting #06 of RTCA SC-186 WG-4B held at the
facilities of Boeing in Renton WA on 22 - 24 August 2006 |
|
|
|
|
For more information on the activities of this Working Group please contact
Don Walker at: