 |
|
|
 |
 |
 |
RTCA
SC-186 Working Group #4: ASAS MOPS
Focusing on the STP and CDTI MOPS
Schedules/Materials/Minutes
This page supports Working Group 4 of RTCA SC-186 in
their efforts to produce and maintain the MOPS documents
for the Cockpit Display of
Traffic Information (CDTI).
Working Group 4
of RTCA SC-186
was realigned into two groups with two different tasks in November,
2004. WG-4A supported the development of the ASA MASPS document.
WG-4B supports the development of the ASAS MOPS documents, which
includes the STP and CDTI. Working Group 4 is
co-chaired by Jonathan Hammer, of The MITRE Corporation/CAASD and
Steve Koczo, of Rockwell Collins. For questions or information about
WG4 activities, please contact Jonathan at <jhammer@mitre.org>.
For a more detailed description of the
activities of these two working groups, please scroll down below the
meeting schedule table.
|
Date/Time |
Meeting Location |
Meeting Page
(contains materials from
sessions of the CDTI, and STP Subgroups) |
|
June 12 - 14, 2006
(SC-186/WG51 Joint
Plenary, 15-16 June) |
RTCA, Inc.
Washington, DC |
|
|
April 17 - 19, 2006
(SC-186 Plenary, 20-21 April) |
Mitre CAASD
McLean, VA |
STP Meeting |
|
April 11 - 13, 2006 |
RTCA, Inc.
Washington, DC |
CDTI Meeting |
|
Mar 7 - 9, 2006 |
RTCA, Inc.
Washington, DC |
|
|
Dec 5 – 7, 2005
(SC-186 Plenary, 8 Dec) |
RTCA, Inc.
Washington, DC |
Joint CDTI/STP
Meeting |
|
Sept 20 – 22, 2005 |
RTCA, Inc.
Washington, DC |
Joint CDTI/STP
Meeting |
|
8 September 2005 |
CDTI Teleconference |
Click here |
|
31 August 2005 |
STP Teleconference |
Click here |
|
July 26 – 28, 2005 |
RTCA, Inc.
Washington, DC |
STP Meeting #9 |
|
June 7 – 9, 2005 |
Honeywell Offices
Redmond, WA |
CDTI
Meeting #9
STP Meeting #8 |
|
May 24 – 26, 2005 |
RTCA, Inc.
Washington, DC |
CDTI
Meeting #8 |
|
March 29 – 31, 2005 |
RTCA, Inc.
Washington, DC |
Joint
CDTI/STP
Meeting #7 |
|
January 25 – 27, 2005 |
NASA Ames
Mountain View, CA |
Joint
CDTI/STP
Meeting #6 |
|
Nov. 1 – 3, 2004
(SC-186 Plenary, 4 Nov) |
RTCA, Inc.
Washington, DC |
Joint
CDTI/STP
Meeting #5 |
|
July 20 – 22, 2004 |
Honeywell Offices
Redmond, WA |
Joint
CDTI/STP
Meeting #4 |
|
May 24 – 27, 2004 |
Rockwell Collins
Cedar Rapids, IA |
Joint
CDTI/STP
Meeting #3 |
|
April 5 – 7, 2004
(SC-186 Plenary, 8-9 April) |
RTCA, Inc.
Washington, DC |
Joint
CDTI/STP
Meeting #2 |
|
February 2 – 5, 2004 |
Embassy Suites North,
Phoenix, AZ |
Joint
CDTI/STP
Meeting #1 |
* - date or location tentative
CDTI Reference Materials
This material is
CDTI-specific reference material.
For meeting schedules and materials related to the ASAS MOPS development effort,
including the CDTI work, please visit the Working Group 4 page
of this web site.
|
CDTI Telecon
Notes |
| 13 |
May 12, 2005 |
| 12 |
April 28, 2005 |
| 11 |
April 14, 2005 |
| 10 |
March 17, 2005 |
| 9 |
March 3, 2005 |
| 8 |
February 17, 2005 |
| 7 |
December 2, 2004 |
| 6 |
November 17, 2004 |
| 5 |
August 11, 2004 |
| 4 |
July 12, 2004 |
| 3 |
May 4, 2004 |
| 2 |
March
10, 2004 |
| 1 |
February 25, 2004 |
|
CDTI Reference
Material |
click here to download 4.3 MB ZIP file containing all CDTI reference
materials. 
|
|
Date |
File
Description |
| April, 2005 |
Current Action Item List for
CDTI subgroup (Excel
Spreadsheet.) |
| April, 2005 |
Summaries of SAE documents and AC 25-11 which contain standards and
requirements for display systems. The will be referenced to make
sure CDTI MOPS material does not conflict with existing standards. (Zip
File.) |
| June, 2004 |
Rationale for CDTI Traffic Symbol
concepts, prepared by Bill Kaliardos, FAA AIR-130. (Word
document.) |
| May, 2004 |
Briefing for SC-147 plenary (TCAS
II) on the status of the CDTI MOPS development effort. (PowerPoint
briefing.) |
| April, 2004 |
Briefing from Sethu defining the
process to be followed for CDTI MOPS development. (PowerPoint
briefing.) |
| April, 2004 |
Slide showing CDTI requirements
overview. (PowerPoint
slide.) |
| March, 2004 |
V2.0 of the NASA User Guide for
CDTI and its symbol set. (ZIP
file containing Word document.) |
| June, 2003 |
Appendix AD of the ASA MASPS
containing draft MOPS level CDTI requirements. (ZIP
file containing Word document.) |
| -- |
Draft appendix not included in
ASA MASPS addressing Human Factors Considerations for the Display of
General Traffic Surveillance Information with comments from Sethu
included. (Word
document) |
| June, 2001 |
Final draft of initial version of
CDTI MOPS, which was never published by RTCA. (Adobe
document.) |
Working Group 4B
is co-chaired by Jonathan Hammer, of The MITRE Corporation/CAASD and
Sethu Rathinam, of Rockwell Collins. For questions or information
about WG-4 activities, please contact Jonathan at <jhammer@mitre.org>.
Currently, WG-4B is developing requirements for the
Airborne Separation Assurance Systems (ASAS) Minimum Operational
Performance Specifications (MOPS). WG-4B sub-groups are
developing requirements for the three major sub-systems of ASAS.
The Surveillance Transmit Processing (STP) sub-group developed and
published
requirements for the STP, which will process own-ship data as
necessary prior to transmitting it within ADS-B broadcasts. The
Aircraft Surveillance Application Processing (ASAP) sub-group is
currently developing requirements for ASAP, which will process received
surveillance data and other information as necessary to perform ASA
applications. The Cockpit Display of Traffic Information (CDTI)
subgroup is currently defining the CDTI, which serves as the flight crew
interface for all ASA applications and equipment .
ASA MASPS
Materials: To download any available materials from the
development efforts of the ASA MASPS (DO-289),
follow this link to a table of
all WG4 ASA MASPS meetings.
|
|
 |
 |
|
Last updated:
08/28/2007 |
|
|