|
File
Name (*.pdf) |
Size |
Description |
|
WG3-Mtg14.zip |
1061KB |
ZIP
file containing the proposed Agenda, Working Paper Summary,
Open Action Item Summary, DO-260A Status Matrix, and all original
Working Papers (excluding WP-14-11) that were submitted
as of 8:00am 24 Sept 2002, for Meeting 14.
|
|
020925-Agenda |
7KB
|
Proposed
Agenda
for WG-3 Meeting #14 held
25 - 27 Sept 2002 at Eurocontrol Headquarters in Brussels
Belgium
|
|
1090-WP-14-01 |
9KB |
Review
of 4-Pulse Preamble Detection Testing, presented by R.H. "Bob"
Saffell |
|
1090-WP-14-02 |
21KB
|
Validation of TASC Simulation,
presented by William Harman
|
|
1090-WP-14-03R1 |
132KB |
Version
0.2 of the Draft of Appendix N: Proposed DO-260A Provisions
for Backward Compatibility with DO-260 Message Formats, presented
by Ron Jones
|
|
1090-WP-14-04R1 |
33KB |
Version
0.2 of the Draft of Appendix O: Accommodation of Trajectory
Change Reporting, presented by Ron Jones
|
|
1090-WP-14-05 |
54KB |
Enhanced
Preamble Detection, Proposed New Material for Appendix I,
presented by John Van Dongen and William Harman
|
|
1090-WP-14-06 |
244KB |
Draft
#1 of A DO-260A Test Procedure Status Matrix, presented by
Gary Furr
|
|
1090-WP-14-07 |
144KB |
Draft
#1 of A Matrix to Compare the Structure of DO-260 versus DO-260A,
presented by Gary Furr
|
|
1090-WP-14-08 |
12KB |
Summary
of the WG-3 Teleconference held at 1pm EDT, 12 September, presented
by Gary Furr |
|
1090-WP-14-09R1 |
265KB |
Proposed
Revision to Appendix A for 1090 TIS-B and ADS-B MASPS Changes,
presented by Vince Orlando
|
|
1090-WP-14-10R1 |
35KB |
A
Summary of all Changes going into DO-260A, presented by Gary
Furr |
|
1090-WP-14-11 |
4.5MB |
Draft
#3 of Sections 1 through 4 of DO-260A, presented by Gary Furr
|
|
1090-WP-14-12 |
15KB |
ATCRBS
Timing Distribution Summary, presented by Tom Pagano
|
|
1090-WP-14-13 |
23KB |
Transmitter Power for Class B2, presented by William
Harman in response to Action Item 13-04
|
|
1090-WP-14-14 |
52KB |
Enhanced
Surveillance Processing Test Processing Performance Data Revision,
presented by John Van Dongen
|
|
1090-WP-14-15 |
22KB |
Non-Poisson
Timing and the Effects on Performance, presented by William
Harman |
|
1090-WP-14-16R1 |
23KB |
CPR Clarification, presented by William Harman
in response to Action Items 9-3 and 13-3
|
|
1090-WP-14-17 |
84KB |
Preliminary
Simulation Results for Various Scenarios, presented by Larry
Bachman |
|
1090-WP-14-18 |
13KB |
An
Approach for testing of 1090 MHz ADS-B Message Scheduling, presented
by Ron Jones |
|
1090-WP-14-19 |
14KB |
Considering
Utility of TYPE Zero (0) Messages on the Airport Surface, presented
by Mark Schneider of Sensis Corp.
|
|
1090-WP-14-20 |
12KB |
Proposal
to Require Support for Receiving and Processing of Version Zero
(0) ADS-B 1090 MHz Messages in Version One (1) Receivers, presented
by Ron Jones |
|
1090-WP-14-21 |
7KB |
Suggested Changes
to Section 2.2.4 Subparagraphs, presented by William Harman
|
|
1090-WP-14-22 |
9KB |
Suggested Changes
to the DO-260 Version of Appendix C, presented by William Harman
|
|
1090-WP-14-23 |
8KB |
Suggested Changes
to the DO-260 Version of Appendix K, presented by William Harman
|
|
020925-Minutes |
41KB |
Minutes
of WG-3 Meeting #14 held 25 - 27 Sept 2002 at Eurocontrol Headquarters
in Brussels, Belgium
|
|
WG51SG1Sept |
16KB |
Minutes
of Eurocae WG-51, SG-1 initial meeting held 25 September 2002
at Eurocontrol Headquarters in Brussels, Belgium
|
For more information on this group's activities please contact the group's
secretary, Gary Furr at: