Federal Aviation Administration Seal

 

Links

RTCA SC-186 Working Group #3

1090 MHz Extended Squitter MOPS

Meeting #11 to Produce DO-260A

 


 


Meeting #11: Held 14 - 15 May 2002, Titan Systems near FAA WJH Tech Center, NJ

File Name (*.pdf) Size Description
WG3-Mtg11.zip 428KB    ZIP file containing the agenda, working paper summary, open action item summary, and all working papers submitted as of 5pm 13 May 2002, for Meeting 11. 
020514-Agenda 6KB   

Agenda for WG-3 Meeting held 14 - 15 May at the offices of Titan Systems in Mays Landing NJ, near the FAA WJH Technical Center

1090-WP-11-01R1 94KB    Proposed Enhancements to the 1090 MHz Extended Squitter MOPS, presented by Ron Jones, FAA, ASD-140 
1090-WP-11-02 17KB   

RMF Enhanced Decoder Re-Triggering Algorithm Description, presented by John Van Dongen in response to Action Item 10-10

1090-WP-11-03 19KB   

RMF Enhanced Decoder Re-Triggering Test Data, presented by John Van Dongen in response to Action Item 10-12

1090-WP-11-04 41KB   

24 May 2000 Six-Minute Frankfurt Data Sample Processed with the RMF Baseline Enhanced Decoder with the New Re-Triggering Algorithm and the 6-Microsecond Post Trigger Dead Time, presented by John Van Dongen in response to Action Item 10-13

1090-WP-11-05 49KB   

Combined Preamble and Data Block Tests with Multi-Level Mode A/C Fruit – Bench Test Data, presented by John Van Dongen in response to Action Item 9-7

1090-WP-11-06 126KB   

Frankfurt May 19, 2000 British Airways Target Reception Data with RMF Baseline Enhanced Decoder, presented by John Van Dongen in response to Action Item 9-10

1090-WP-11-07 9KB   

Proposed Revision of the Text on the Requirement for the Multi-Sample Technique in Appendix I, presented by Dr Vince Orlando in response to Action Item 10-6

1090-WP-11-08 22KB    Proposal for a TIS-B Management Message Format, presented by Dr Vince Orlando, and previously presented as 1090-WP-8-04 in response to Action Item 2-16 
1090-WP-11-09 21KB    Proposed TIS-B Ground Architecture, presented by Dr Vince Orlando, and previously presented as 1090-WP-8-07 in response to Action Item 7-3 
1090-WP-11-10 62KB    Draft #8 of the Enhanced Surveillance Processing Test Procedures, presented by John Van Dongen in response to Action Item 9-4 
1090-WP-11-11 7KB    Coding of the "Vertical Rate" and the "Geo Altitude Difference from Baro" Fields of the Airborne Velocity Message, presented by Dr Vince Orlando 
1090-WP-11-12 19KB    Draft of 1090 MOPS Material for TIS-B Message Processing and Reporting, Sections 2.2.17.4 to the end of 2.2.17, presented by Dr William Harman 
020514-Minutes 44KB    Minutes of Meeting #11 held 14 - 15 May at the offices of Titan Systems in Mays Landing NJ, near the FAA WJH Technical Center 

                  Meeting #10                                  Meeting #12


For more information on this group's activities please contact the group's secretary, Gary Furr at:

email: Gary.CTR.Furr@faa.gov
phone: (609) 485-4254

 

 

Last updated: 03/05/2003
firstgov.gov | Privacy Policy | Web Policies & Notices | Site Map | Contact Us | Frequently Asked Questions | Forms
Department of Transportation Seal U.S. Department of Transportation
Federal Aviation Administration
800 Independence Avenue, SW
Washington, DC 20591
1-866-TELL-FAA (1-866-835-5322)
Readers & Viewers: PDF Reader | MS Word Viewer | MS PowerPoint Viewer | MS Excel Viewer | Zip