| File
Name |
Size |
Description |
|
ModeS-WP01-01 |
13 KB |
Proposed Agenda for Meeting #01
of RTCA SC-209 Working Group #1 for the Maintenance of the
Mode-S MOPS, to be held at the RTCA Headquarters in Washington
DC on 3 - 5 April 2007. |
|
ModeS-WP01-02R1 |
48 KB |
Summary of Meeting
#06 of RTCA Special Committee 209,
in a Joint Plenary Session with Eurocae WG-49 which was held in
Melbourne Florida starting 29 January through 2 February 2007
(RTCA Paper No. 014-07/SC209-012).
(Revision 1
reflects edits performed and agreed to during the Working Group
meeting to paragraph 5.2) |
|
ModeS-WP01-03R1 |
962 KB |
Proposed Requirements and Test
Procedures for Elementary and Enhanced Surveillance for proposed
inclusion into the draft of DO-181D, as presented by Robert
Saffell of Rockwell Collins (Revision 1
reflects edits performed and agreed to during the Working Group
meeting) |
|
ModeS-WP01-04 |
1,127 KB |
Draft version 0.1 of the proposed
Appendix C to DO-181D representing the Dataflash Application
information extracted from the current draft of ED-101, in
response to Action Item 6-2, as presented by Gary Furr of
Engility Corp. |
|
ModeS-WP01-05 |
111 KB |
Proposed Changes to the Comm-B
Protocol Test Procedure #18 in the draft of DO-181D, as
presented by John Van Dongen of the FAA Technical Center |
|
ModeS-WP01-06 |
74 KB |
Proposed Changes to the Comm-B
Requirements of Section 2.2.19.2.3.3 in the draft of DO-181D, as
presented by John Van Dongen of the FAA Technical Center |
|
ModeS-WP01-07R2 |
11 KB |
Proposed Changes to the draft of
Appendix B in response to Action Item 6-4, as presented by Gary
Furr and Andy Leone of the FAA Technical Center
(Revision 1 corrects bad reference to
adding sections to the end of Appendix B. Corrected to
B.5. Revision 2 adds section C.2.4.3 to the list of text
copied into B.5) |
|
ModeS-WP01-08R1 |
70 KB |
Proposed Changes to the Reply
Request (RR) Uplink Field to Encompass EHS Registers, as
presented by Andy Leone of the FAA Technical Center
(Revision 1 reflects edits performed and
agreed to during the Working Group meeting) |
|
ModeS-WP01-09 |
591 KB |
Draft version 1.5 of the Proposed
Appendix B to DO-181D for Mode S Specific Services, as presented
by Gary Furr of Engility Corp. |
|
ModeS-WP01-10 |
10 KB |
The L-3/ACSS Response to SC-209
Action Item 6-3 Requesting the Testing of Their Own Transponders
for Reply Rate Capabilities, as presented by Doug Guetter of
L-3/ACSS |
|
ModeS-WP01-11 |
9 KB |
The BAE Systems Response to SC-209
Action Item 6-3 Requesting the Testing of Their Own Transponders
for Reply Rate Capabilities, as presented by Raymond Bayh of BAE
Systems |
|
ModeS-WP01-12 |
21 KB |
The Honeywell Response to SC-209
Action Item 6-3 Requesting the Testing of Their Own Transponders
for Reply Rate Capabilities, as presented by Showkat Osman of
Honeywell |
|
ModeS-WP01-13 |
10 KB |
The Rockwell Collins Response to
SC-209 Action Item 6-3 Requesting the Testing of Their Own
Transponders for Reply Rate Capabilities, as presented by Robert
Saffell of Rockwell Collins |
|
ModeS-WP01-14 |
10 KB |
The Raytheon Response to
SC-209 Action Item 6-3 Requesting the Testing of Their Own
Transponders for Reply Rate Capabilities, as presented by Jerry
Woodall of Raytheon |
|
ModeS-WP01-15 |
10 KB |
The Garmin International Response to
SC-209 Action Item 6-3 Requesting the Testing of Their Own
Transponders for Reply Rate Capabilities, as presented by Nolan
Van Foeken of Garmin International |
|
ModeS-WP01-16R1 |
14 KB |
The Consolidated Set of Comments
Received back from Membership Related to the Proposed ELS and
EHS Requirements and Test Procedures that were Presented in
Working Paper ModeS-WP01-03, consolidated and presented by Gary
Furr of Engility Corp.
(Revision 1 reflects additional comments
from Honeywell and the Working Group responses as
agreed to during the Working Group meeting) |
|
ModeS-WP01-17 |
3,280 KB |
Draft version 0.7 of the Proposed
Mode-S Transponder MOPS, DO-181D, as presented by Gary Furr of
Engility Corp. |
|
ModeS-WP01-18 |
31 KB |
ATCRBS
Transponder Issue with Decoding Mode S P6 as a Result of Failure
to Detect the Mode S Interrogation (preamble) P1 Pulse that
Produces False Targets at Interrogators, as presented by Jerry
Woodall of Raytheon |
|
ModeS-WP01-19 |
24 KB |
Sample Differences in DO-181D and
ED-73C, as presented by Bill Thedford |
For more information on the activities of this Working Group of
SC-209 please contact the
Committee Secretary, Gary Furr at: