DO-185 Materials
and
RTCA SC-147 Activities
Draft DO-185B Files
UPCOMING TCAS
MEETINGS
| |
|
|
|
|
Requirements Working Group |
None Scheduled |
|
|
|
|
|
| |
|
|
|
|
Operations Working Group |
None Scheduled |
|
|
|
|
. |
| |
|
|
|
|
RTCA SC-147 |
None Scheduled |
|
|
|
|
|
| |
|
|
|
|
TCAS Program Review |
None scheduled |
|
|
|
|
|
"TCAS II
Requirements Working Group Recommended
Modifications 2.0 to TSO C119B, 12 March 2001"
This set of recommended changes to DO-185A include resolutions
to
Change Proposals 93-111, with the exception of CP98 which was
addressed in "Mods 1.0" found below.
| File Name |
Size |
Description |
| Mod
2 Files.zip |
1,187 KB |
This ZIP files contains the following PDF files:
Mod 2
Cover Letter: Cover letter from RWG chair.
Mod 2 Summary: Two
page summary of what material was
for each CP resolution.
Mod 2 Closed CPs:
All CPs closed with Mod 2 including
their final resolution.
Mod 2 Errata-Vol1: Errata
sheet of all Volume 1 Mod 2 changes.
Mod 2 PCode Change
Pages: All PCode change pages for Mod 2.
Mod 2 CRS Change Pages:
All CRS change pages for Mod 2.
Mod 1 CRS Change Pages: All
change pages from CP98 resolution. |
| Mod
2 Test Suite.zip |
2,613 KB |
This ZIP file contains three other ZIP files. The
1st zip file contains all 311 inputs for the test suite, the 2nd
contains outputs for both PCode-based and CRS-based outputs, and the 3rd
contains transition files. |
| Mod
2 TSIM |
1,657 KB |
This file contains all files (except inputs) needed to run
TSIM for Mod 2 complaint requirements. |
"TCAS II
Requirements Working Group Recommended
Modifications 1.0 to TSO C119B, 21 April 1999"
Change Proposal 98
(with supporting material) |
04/22/99 |
CP98.doc |
Change Proposal 98
(PDF File) |
04/22/99 |
CP98.pdf |
Test Suite Analysis
(process followed by WJHTC) |
04/20/99 |
TS_STUDY.doc |
Test Suite Analysis
(PDF File) |
04/22/99 |
TS_STUDY.pdf |
New Test EN03TS80
(contains 3 files for modified test) |
04/21/99 |
EN03TS80.zip |
New Test Suite Inputs
(includes new EN03TS80) |
04/21/99 |
EN_FILE2.zip |
New Test Suite Outputs
(includes new EN03TS80) |
04/21/99 |
FT_FILE2.zip |
New Test Suite Transitions
(includes new EN03TS80) |
04/21/99 |
TR_FILE2.zip |
New 'unverified' TSIM
(with CP98 implemented) |
04/09/99 |
TSIM-NEW.zip |
DO-185A
Changes
On November 19th, 1998, Technical Center personnel made
the entire set of
DO-185A Change Proposals (1-92) available for download.
TSO C119B
Changes for DO-185A
The files found in the table below detail
the changes to RTCA
document DO-185A recommended by the Requirements
Working Group of SC-147 and referenced by TSO C119B.
NOTE: All files,
once unzipped are in PDF format. If you do not have Adobe's
PDF reader, follow this link to Adobe's Home Page and download their free software.
Test Suite Files
TSIM Program Files
| TSIM.ZIP |
|
Complete set of TSIM files as of 11/17/98. |
Volume I (Formatted
MOPS)
CAS Requirements
Specifications (CRS)
For more information on TCAS activities or the content
of this page, please contact J. Stuart Searight at
Stuart.Searight@faa.gov.